Process Overview
This assembly automation solution uses a YUSHIN take-out robot (SCⅡ 150) to perform insert molding, placing a nut into the mold and overmolding it with plastic, followed by automated inspection. By automating both the insert-loading operation and the downstream inspection process, the system minimizes quality-control touchpoints while improving overall productivity.
Components
- Robot
Injection molding take-out robot YUSHIN SCⅡ-150D (for insert loading) 5-axis Cartesian robot + 90° tilting arm Payload: 5 kg Repeatability: ±0.1 mm Stroke (robot specs): Travel 1,500 mm / Vertical 850 mm / Fore–aft 468 mm End-of-arm tooling (EOAT) / Tools Pneumatic grippers: 8 units (Insert loading 4 / Part take-out 4) 3-axis Cartesian robot for vision inspection (including a rotary tool Pneumatic grippers: 3 units (Vision inspection 1 / Orientation-change jig loading 2)
- Peripherals
Insert injection molding equipment (optional / separate) Bowl feeder (BOWL FEEDER) Nut loading cylinder Finished-part transfer unit (post-insert) Insert orientation-change jig Vision inspection system
Workflow
- STEP 1.
- Feed and singulate nut blanks via the bowl feeder
- STEP 2.
- Pick four nut blanks
- STEP 3.
- Load them into the insert-molding station
- STEP 4.
- Take out the insert-molded parts and load them onto the finished-part transfer unit
- STEP 5.
- Move the parts to the orientation-change jig
- STEP 6.
- Pick parts one-by-one for vision inspection
- STEP 7.
- Sort and discharge into trays based on inspection results